Parklinks has the parks, the bridge and a price list. What it does not yet have is an open mall. Buyers who understand that gap can plan around it instead of paying for it blind.

Picture a buyer named Ana who works in Ortigas Center and rents in Pasig. She has spent two weekends gathering brochures for condos along C5, including price lists for Parklinks. One agent tells her Parklinks is the greenest area in Metro Manila, another mentions the mall isn’t open yet, and a third shares a price list starting at ₱10.7 million stretching over ₱100 million. While each agent provides true information, none explains how it all connects.
This guide organizes key information. Ayala Land and Eton Properties announced that the Parklinks mall will open in 2027. Until then, pre-selling units are available, but the mall is not yet operational, meaning buyers are paying for future potential. Below, you will find details on what has been constructed, what is planned, the cost of a Parklinks condo per square metre, break-even rent, and important checks before signing. The information is sourced from developer websites, press releases, and broker price lists, with clear labels for each source.
- Parklinks is a 35-hectare Ayala Land and Eton estate on both banks of the Marikina River: about 30 hectares in Pasig and 5 in Quezon City, with roughly half planned as parks.
- The mall is reported to open in 2027, but an older Alveo page said 2023. Treat every date as a target until the developer confirms it in writing.
- Pre-selling prices start at ₱10.7 million at The Lattice and ₱26.9 million at the North and South Towers. A broker list puts the towers at about ₱333,000 to ₱382,000 per sqm.
- On our assumptions, a 4% gross yield covers only about 55% of a 20-year mortgage payment on either price tier.
- Before you reserve, check the license to sell, get the turnover schedule in writing, and look up the site’s flood exposure.
What Parklinks Actually Is
Parklinks is a 35-hectare planned estate located on both sides of the Marikina River. About 30 hectares are on the Pasig side in Manggahan, and 5 hectares are on the Quezon City side in Ugong Norte. A 110-meter bridge connects the two sides for pedestrians and cyclists. The developer is a partnership between Ayala Land and Eton Properties, which is part of LT Group. Wikipedia states that this partnership began in 2016, with the first phase launching in 2018. The site was previously a steel mill, which explains how such a large estate could be developed in Metro Manila.
Pasig or Quezon City? Both, and It Matters
Marketing materials refer to “between Pasig and Quezon City,” which is correct, but each unit is on one side. Alveo positions The Lattice in Pasig, while Ayala Land states it’s at the intersection of both cities. It’s important to check which city your unit’s title and tax declaration belong to, as real property tax, business permits, and local transfer taxes come from the relevant city hall. This is less significant for owner-occupants but very important for investors looking to operate a rental business from the unit.
Parklinks at a glance (schematic, not to scale)
The Marikina River (gold strip) separates the two banks. A 110-metre bridge for pedestrians and cyclists links them.
Land-use split as stated by Ayala Land. Sizes come from Ayala Land, Alveo and Wikipedia.
A Parks-First Masterplan
The key feature is the ratio of green space. Half of the estate is designed as parks and open areas, including a 3-hectare central park with paths, terraces, and bike trails. Ayala Land claims that parks are within a five-minute walk from any point in the estate and promotes Parklinks as the greenest urban development in Metro Manila. While this is the developer’s claim and not an independent assessment, the land-use division is a specific detail you can verify in the masterplan.
The rest features a typical Ayala setup: a five-storey mall with a 3,500-sqm sports complex, three planned office towers (one above the mall), and interconnected residential towers. The estate includes MIIS school, opening in August 2026, and Casa Ibarra events venue, which has two ballrooms for around 850 guests.
Built, Open, or Still Promised: Where Things Stand in Late 2026
Estate marketing connects current developments with future plans. The bridge, school, and Experience Center are the most advanced, while the events venue and first retail pavilions are expected by the end of the year, followed by the mall and office towers. The table indicates the status of each item based on available sources and highlights any unconfirmed information.
| Component | Status | Basis |
|---|---|---|
| 110-m pedestrian and bike bridge | Built | Reported complete in 2021 (older Alveo page) |
| MIIS school | Due Aug 2026 | Mindanao Times; confirm it is operating |
| Parklinks Experience Center | Open | Reported recently opened (Mindanao Times) |
| Casa Ibarra events venue | Later in 2026 | Mindanao Times |
| First retail pavilions | By end-2026 | Mindanao Times |
| Parklinks Mall | 2027 | Manila Times, BusinessWorld, Mindanao Times |
| Office towers (three, phase 1) | Planned | Ayala Land estate page; no dates found |
| North Tower (55 storeys) | Unconfirmed | Pre-selling; broker says Q4 2025, no developer confirmation found |
| South Tower | Unconfirmed | Pre-selling; broker says Q2 2027, no developer confirmation found |
| The Lattice (Alveo) | Unconfirmed | Pre-selling as of Oct 2025; no turnover date on Alveo’s page |
Two points are important. First, the mall’s completion date has shifted from 2023 to 2027, which highlights the need to verify date information on price lists. Second, the North Tower is listed for a Q4 2025 turnover and the South Tower for Q2 2027, but there is no confirmation from the developer. Always request the current schedule in writing before depending on it.
The Residences: Parklinks North and South Towers and The Lattice
Two developers sell homes in the estate for various budgets.
Parklinks North and South Towers (Ayala Land Premier)
Ayala Land offers 593 units in two towers, with sizes from 70 to 306 sqm and prices starting at ₱26.9 million, currently in pre-selling. The North Tower has 55 storeys and 280 units, while the South Tower has 313 units. One-bedroom units of 70 sqm are priced at ₱26.7 million, two-bedrooms of 142 sqm at ₱47.3 million, and three-bedrooms of 215 sqm at ₱74.8 million, with all four-bedroom sky villas sold out. The highest price listed on Ayala Land’s estate page is ₱118 million.
The North Tower connects directly to the mall and the River Esplanade, featuring a pool, gym, social hall, sports court, and outdoor lounge with a play area.
The Lattice at Parklinks (Alveo)
The Lattice is the entry point, featuring three towers with studio units around 30 sqm, one-bedrooms at 58 sqm, two-bedrooms at 103 sqm, and three-bedrooms at 134 sqm, starting from ₱10.7 million. The project is in pre-selling as of October 2025, located in Pasig, about 4 km from Ortigas Center and 9.4 km from BGC. There are discrepancies regarding the tower’s height, with Wikipedia stating it has 43 stories and various sources offering different unit counts. Please contact the sales team for the latest inventory and tower turnover schedule.
Two Price Tiers, Two Buyer Profiles
The Lattice has an entry price that is around 40% of the Premier towers’ entry price. This makes it attractive for buyers with budgets of ₱10 million to ₱20 million, such as first-time investors and young professionals. The Premier towers, on the other hand, are larger homes for end-users seeking an Ayala address and more space, appealing mainly to cash-rich buyers who don’t rely on rental income. This is our interpretation of the pricing, not an official statement from the developer.
| North and South Towers | The Lattice | |
|---|---|---|
| Developer line | Ayala Land Premier | Alveo |
| Starting price | From ₱26.9 million | From ₱10.699 million |
| Unit sizes | 70 to 306 sqm | About 30 to 134 sqm |
| Unit types | 1BR to 4BR (sky villas sold out, per broker) | Studio to 3BR |
| Towers and units | 2 towers, 593 units | 3 towers referenced on Alveo’s page; unit count varies by source |
| Side of the river | Estate boundary of Pasig and QC | Pasig |
| Sales status | Pre-selling | Pre-selling (as of Oct 2025) |
| Turnover | Not confirmed (broker: Q4 2025 North, Q2 2027 South) | Not stated |
Many listings overlook the price per square metre. By dividing asking prices by unit size, you can compare different unit types more easily.
Asking price per sqm (₱), pre-selling units
Premier figures are broker-listed starting prices divided by unit size (₱26,745,000 / 70, ₱47,316,000 / 142, ₱74,795,000 / 215). The Lattice figure assumes Alveo’s ₱10,699,000 starting price is for a 30-sqm studio, which its page does not state. Asking prices, not closed sales. Rounded to the nearest ₱100.
Read these as asking prices from a broker list and a developer’s starting price, not as closed sales. In our September 2026 Vertis North update, we recorded secondary-market asking prices of ₱226,230 to ₱288,000 per sqm at The High Park. This includes both new pre-selling units and resale units from a different area in Metro Manila, so consider it a reference point rather than a final judgment.
The Parklinks Mall: The 2027 Catalyst
The mall is what most buyers are eagerly anticipating. Ayala Land announced in July that Parklinks Mall will open in 2027, as part of a larger estate expansion, according to BusinessWorld. No anchor tenants have been named by the sources we found.
Size is still uncertain. Wikipedia states there is approximately 52,000 sqm of retail space across five floors, while our previous Pasig guide mentioned 58,000 sqm. Mindanao Times reported a gross area of 69,000 sqm with about 41,000 sqm leasable. Since gross, leasable, and retail areas are measured differently, they may refer to different aspects, but for now, they provide three different answers to the same question. We’ll use the developer’s leasable area figure once it’s released.
What a Mall Opening Tends to Do for a Condo
A mall impacts daily life more than it affects prices. Residents enjoy easy access to groceries, services, and dining, tenants benefit from increased rental appeal, and buyers gain assurance of the property’s existence. However, a mall doesn’t ensure value appreciation, as pre-selling prices usually factor in the expected mall. The key question is how much of the mall’s value is already reflected in current prices, and no source we’ve found provides that information for Parklinks.
What to Watch Before and After Opening
- Written confirmation of the opening date and the leasable area from the developer.
- Named anchor tenants, and whether they have signed leases or only letters of intent.
- Construction progress on the first office tower, which shows the estate is moving beyond residential.
- A completed walkway link between the towers and the mall.
- The first retail pavilions actually trading by the end of 2026.
- Turnover of the North Tower, which would produce the estate’s first real rent and resale data.
Location and Access: C5, Ortigas, and the Riverside Question
Parklinks can be accessed via C5 Road, Ortigas Avenue, and Amang Rodriguez Avenue. Alveo indicates that Ortigas Center is about 4 km away and BGC is around 9.4 km, which may feel longer during rush hour. Our Pasig guide notes that C5 is a 32.5-kilometre route undergoing extensive construction and suggests it as a good investment for those willing to wait, as some advantages depend on infrastructure developments expected to continue into the 2030s.
| Route or landmark | What it gives you | Note |
|---|---|---|
| C5 Road | North–south link toward Pasig, Taguig and BGC | 32.5-km corridor under heavy construction (our Pasig guide) |
| Ortigas Avenue | Route toward Ortigas Center | About 4 km from The Lattice |
| Amang Rodriguez Avenue | Third access road named by Ayala Land | Test the drive at rush hour |
| Bonifacio Global City | Second business district within reach | About 9.4 km from The Lattice |
| Ortigas subway station | Planned rail access on Meralco Avenue | 2032 target, already delayed about three years before construction (our Pasig guide) |
The River
An estate on both sides of the Marikina River should undergo a flood-risk assessment before paying any reservation fee. We couldn’t find any flood history or mitigation plans for Parklinks, so don’t assume they exist. Check the government’s HazardHunterPH map for the location, request the developer for site elevation and drainage design, and ask the building administrator or current residents how the estate dealt with recent typhoons if any tower is occupied. Our flood-zones guide outlines what to consider.
Parklinks Condo Investment Analysis: Prices, Rent, and Financing
Investment math for a pre-selling estate starts with a warning: no sources provide closed-sale prices or actual rents for Parklinks units. Rather than guessing yields, this section asks what rent a unit would need to earn.
What Rent Do You Need?
Gross yield is calculated by dividing annual rent by the purchase price. For a ₱10.7 million Lattice unit, monthly rents would need to be around ₱26,700, ₱35,700, and ₱44,600 for yields of 3%, 4%, and 5%. A ₱26.9 million Premier one-bedroom would require about ₱67,300, ₱89,700, and ₱112,100. Our Vertis North update mentions gross yields of 4% to 6% and 7% to 9% in BGC. These scenarios reflect lower expectations since premium-priced units typically yield less and are not forecasts for Parklinks.
| Scenario | Gross yield | The Lattice entry (₱10.7M) | Premier 1BR (₱26.9M) |
|---|---|---|---|
| Low | 3% | About ₱26,700 | About ₱67,300 |
| Base | 4% | About ₱35,700 | About ₱89,700 |
| High | 5% | About ₱44,600 | About ₱112,100 |
Compare these figures with the current lease prices for similar units in Ortigas and Pasig. If the rents are lower than the base case, the unit is more about appreciation than income. Our cap rate guide explains how to account for dues, vacancies, and taxes.
Financing: What the Payment Looks Like
Pag-IBIG increased its maximum housing loan to ₱10 million on May 26, 2026, as detailed in our Pag-IBIG cap guide. This cap limits the loan amount, not the property price, meaning the ₱8.6 million loan for an 80% financed Lattice entry unit qualifies, while a ₱21.5 million loan for a ₱26.9 million Premier unit does not, requiring Premier buyers to use a bank or cash. Pag-IBIG enforces a 35% capacity-to-pay rule and loan-to-value limits, and it’s essential to verify if the developer accepts Pag-IBIG financing for the project.
As an example, the table below shows a bank scenario for both tiers: the 6.75% one-year fixed rate from our September update, a 20% down payment, and a 20-year term. The rate changes after the fixed period, so the actual payment may vary.
| Unit price | Down payment | Loan | Monthly payment | Income at 35% payment ratio |
|---|---|---|---|---|
| ₱10,699,000 (Lattice entry) | ₱2,139,800 | ₱8,559,200 | About ₱65,100 | About ₱186,000 |
| ₱26,900,000 (Premier entry) | ₱5,380,000 | ₱21,520,000 | About ₱163,600 | About ₱467,500 |
Set next to the rent table, the situation is clear. With a 4% yield, rent only covers about 55% of the mortgage payment, meaning a buyer needs to cover the difference each month and hopes for property value growth. This can work, but it needs to be planned. A lower interest rate helps slightly: at Pag-IBIG’s 5.75% for loans between ₱4.9 million and ₱10 million, valid until December 31, 2026, the payment would be around ₱60,100, with rent covering about 59%. The 35% payment-to-income ratio aligns with Pag-IBIG’s guidelines and is a common banking standard, so check with your lender.
Resale Liquidity
Price tier affects the duration of an exit. Properties priced over ₱30 million attract fewer buyers compared to those in the ₱10 million to ₱15 million range, meaning a Premier owner may have a longer wait for the right buyer. We couldn’t find any price forecasts for Parklinks, nor does this article provide one.
Risks and Due Diligence Before You Reserve
Pre-selling buyers pay for something that isn’t fully finished yet, so the risks are mostly about timing and paperwork rather than location.
| Risk | What to ask or check | Why it matters |
|---|---|---|
| Turnover delay | A written schedule per tower and the delay remedies in your Contract to Sell | Dates on older pages have already moved, including the mall’s |
| Mall timing | Confirmed opening date and named anchor tenants | Much of the estate’s daily appeal depends on it |
| Flood exposure | Hazard map, site elevation, drainage and mitigation works | The estate straddles the Marikina River |
| Legal paper trail | The project’s license to sell on DHSUD’s portal | It is the legal basis for selling pre-selling units |
| Price versus comparables | Five asking comps in Ortigas and Pasig, and any recent closed sales | Asking prices are not closed prices |
| Carrying cost | Mortgage versus realistic rent | About 55% covered at a 4% gross yield |
| Exit | Who buys at your price, and how long comparable units take to sell | Above ₱30M the buyer pool is thinner |
Ayala Land reported a net income of ₱11.5 billion in the first half of 2026, which is a 19% decrease from the previous year. They delivered about 6,000 units across 40 projects. While this indicates a slower year for a major developer, it is not alarming on its own. A more pressing issue is the projected 25.6% vacancy rate for Metro Manila in 2026, the highest ever. This suggests that the office component of Parklinks may serve more as a long-term amenity rather than a source of immediate demand.
Before paying a reservation fee, check the project’s license to sell. Our guide on how to check a DHSUD license online explains the process. If the project has a temporary license, make sure to read about the escrow rule first.
Living in Parklinks: Parks, Schools, and Weekends
The estate is designed for easy walking, with parks, a river walkway, and bike trails all within five minutes. A planned 3,500-sqm sports complex and an on-site school add to its appeal, and the North Tower will connect to the mall. It’s ideal for families wanting green space, professionals commuting to Ortigas Center, and downsizers seeking a walkable area. However, it’s less suitable for those needing immediate access, as the mall and most retail spaces are not yet open.
A Buyer Checklist: End-User, Investor, Overseas Buyer
The right questions depend on why you’re buying. Choose the column that suits you, and check the others for what your agent might miss.
| End-user | Investor | Overseas or foreign buyer |
|---|---|---|
|
|
|
The Bottom Line
Parklinks is a partially built estate with a clear design and a future mall. For buyers, this means paying now for a promise that may change. If you’re a user who appreciates parks and can wait, consider The Lattice’s price or, if you have more funds, the Premier towers. For investors focused on rental income, patience is key: the mall’s opening and North Tower’s turnover will provide the first real data on rents and resale values. Until then, ensure you get dates in writing and buy only what you can afford to hold.
Parklinks FAQs
Is Parklinks in Pasig or Quezon City?
Both. About 30 hectares are on the Pasig side and about 5 hectares on the Quezon City side, separated by the Marikina River. Check which city your unit’s title and tax declaration list.
When does the Parklinks mall open?
Ayala Land has said 2027. An older Alveo page said 2023, so treat dates as targets. The sources we read had not named anchor tenants.
How much are condos in Parklinks?
Alveo’s The Lattice starts at ₱10.7 million and the Ayala Land Premier North and South Towers start at ₱26.9 million. These are pre-selling asking prices and can change.
Who owns Parklinks?
It is a joint venture between Ayala Land and Eton Properties, the real estate arm of LT Group. Wikipedia’s summary describes it as a 50-50 partnership formed in 2016.
Is Parklinks a good investment?
No published rent or resale data exists yet. On our assumptions, a 4% gross yield covers about 55% of a 20-year mortgage payment, so it suits buyers who can hold and fund the gap.
| Pasig City Investor Deep Dive: Ortigas, Kapitolyo, and the C5 Corridor The wider Ortigas and C5 picture around Parklinks. | → |
| Is Vertis North Still a Buy in 2026? A Data-Driven Update How we track another Ayala Land estate: asking prices, yields and financing. | → |
| How to Check a DHSUD License to Sell Online (2026 Guide) The check to make before any reservation fee. | → |
| Cap Rate, Rental Yield & Cash-on-Cash Return in PH Real Estate Turn an asking rent into a net yield. | → |
| Marikina City Real Estate Guide 2026: Prices, Flood Risk, and Where to Buy Flood-risk context for buyers near the Marikina River. | → |
Considering Parklinks? Get a Second Look Before You Reserve
Send us the tower, the unit and the asking price. U-Property PH will compare it against current Ortigas and Pasig listings and flag anything in the license to sell, the turnover schedule or the payment terms that needs a closer look before you pay a reservation fee.
This article is for general informational purposes only and does not constitute legal, financial, or professional advice. Market conditions, laws, regulations, and government fees change. Prices shown are asking prices from developer pages and a broker list checked on September 21, 2026, and are not appraisals or closed sales. Opening dates, turnover dates and yield scenarios are targets or our own arithmetic and are not guarantees. Always consult a licensed real estate broker, lawyer, or tax professional for advice specific to your situation.
Sources
- Ayala Land, “Parklinks estate.” ayalaland.com
- Ayala Land, “Parklinks North and South Towers.” ayalaland.com
- Alveo Land, “The Lattice at Parklinks.” alveoland.com.ph
- Alveo Land, “Parklinks Estate in Pasig and Quezon City” (older page; some status details may be outdated). alveoland.com.ph
- Wikipedia, “Parklinks.” en.wikipedia.org
- Mindanao Times, “Parklinks Mall to Open in 2027, Anchoring Ayala Land–Eton Estate’s Next Growth Phase.” mindanaotimes.com.ph
- The Manila Times, “Parklinks Mall to open next year – Ayala Land” (July 21, 2026; headline only). manilatimes.net
- BusinessWorld, “Ayala Land, Eton advance Parklinks expansion with 2027 mall opening” (July 21, 2026; headline only). bworldonline.com
- Ayala Land, “Ayala Land Posts ₱11.5B Net Income in First Half of 2026” (headline only). ayalaland.com
- Preselling.com.ph, “Parklinks North and South Towers” (broker listing; asking prices, checked September 21, 2026). preselling.com.ph
- Ayala Land Premier broker site, “Parklinks North Tower” (broker marketing content). ayala-land-premier.com
- U-Property PH, “Is Vertis North Still a Buy in 2026? A Data-Driven Update” (September 3, 2026). upropertyph.com
- U-Property PH, “Pasig City Investor Deep Dive: Ortigas, Kapitolyo, and the C5 Corridor.” upropertyph.com
- U-Property PH, “Pag-IBIG’s ₱10M Loan Cap: What It Actually Changes for Buyers” (cap, promotional rates, 35% capacity-to-pay rule). upropertyph.com
Method: asking prices only, from developer pages and one broker list checked on September 21, 2026. Price-per-sqm figures, rent scenarios and the financing illustration are our own arithmetic from the assumptions stated in the article. Where a source page could not be opened in full, we relied on its headline only and say so.

Leave a Reply